Module 4 – Surface Water Injection Equipment

  • Injection tanks
    • Volume requirements
    • Injection Pumps
    • Positive Displacement
    • Turbine
    • Centrifugal
  • Injection lines
    • Volume requirements
    • Pressure requirements
    • Environmental requirements
  • Injection header (Individual well distribution)
    • Pressure distribution
    • Volume ControlMetering

HomeĀ Applied Petroleum Technology Academy

mailing address: APTA Permian Basin Inc.

P.O. Box 8002, Midland, Texas 79708

telephone 1-432-352-0785 | fax 1-432-687-4633

email rgillette@aptapb.org